Autostrada A18 | |
---|---|
Route information | |
Part of E36 | |
Length: | 7 km (4 mi) 78 km (48 mi) planned |
Major junctions | |
From: | Bundesautobahn 15 at border with Germany at Forst-Bademeusel/Olszyna |
To: | A4 motorway near Krzyżowa |
Location | |
Major cities: | Żary |
Highway system | |
Autostrada A18 is a short planned motorway in southwestern Poland which is to run from the Polish/German border at Olszyna/Forst-Bademeusel and the German Bundesautobahn 15 to the Polish Autostrada A4. The highway is a part of the European route E36 and the Pan-European corridor IIIA from Berlin to Wrocław.
After it's completed, the A18 should be 78 km (48 mi) long. The stretch currently opened and signed as A18 from Golnice to the A4 is 7 km (4.3 mi) long. The remaining 71 km (44 mi) exists presently as a dual-carriageway road not up to motorway standards and not officially signed a such. Before August 2009, the signed A18 was 17 km long,[1] until part of it was resigned as A4 in the summer of 2009, after the completion of a missing stretch of that motorway.
The motorway had its beginning as a single-carriageway Reichsautobahn built by Germany in the 1930s.[2] This route had all the features of an autobahn built according to the standards of the time, except that only a single carriageway was actually constructed along most of its length, and space was left for constructing the second carriageway at a later time. The road existed in this state until the early 1990s when the first 7 km (4.3 mi) at its eastern end were rebuilt with new concrete carriageways. In 1995 the 7 km stretch on the western end was modernised with the addition of a second carriageway.
From 2004 onward, construction work has been progressively carried out to upgrade the whole stretch to modern standards, so that it can officially be designated as an Autostrada in its entirety. Between 2004 and 2006 the missing northern carriageway was completed on the whole length[3] and most of the overpasses and bridges were reconstructed. By June 2007, the road had two carriageways in use. However, the older of the two is in very poor shape, as it still has a surface made of concrete slabs laid in the 1930s. The next stage of the reconstruction has not started as of September, 2010, the delay resulting from changes in the motorway project required by new environmental protection rules (A18 passes through Natura 2000 protected areas)[4]. On July 15, 2010 the environmental impact decision for the revised project was issued [5] which should allow for the contract bidding procedure to be completed and for construction to start in 2011. However, in December 2010 the Polish government announced significant cutbacks to its funding for road construction, which may delay the project for some years. During the final stage of reconstruction, traffic will be shifted to the northern carriageway, and then the southern carriageway should be demolished and built anew.
|